• MrFinnbean@lemmy.world
    link
    fedilink
    arrow-up
    0
    ·
    11 months ago

    Last winter snow pressed trees against the power line and it rook 36 hours for electric company get it fixed.

      • MrFinnbean@lemmy.world
        link
        fedilink
        arrow-up
        0
        ·
        11 months ago

        There are about 14 500 km of powerlines in my country and many of those go trough long unhabitabed stretches. Another thing is that where i live ground freezes and that makes the ground shift, sometimes enough to ruin foundations of buildings so there are some real problems to make long underground lines.

        But yes. It would be nice if underground lines were easy to make.

        • birdwing@lemmy.blahaj.zone
          link
          fedilink
          arrow-up
          0
          ·
          11 months ago

          You know what, that’s a fair argument. Maybe those lines could use frost protection and insulation. Or the trees being cut near power lines (but only there insofar necessary, not as a pretext to cutting them everywhere).

      • Cypher@lemmy.worlddeleted by creator
        link
        fedilink
        arrow-up
        0
        ·
        11 months ago

        Underground lines cost 3 to 20 times more, have higher power loss, last about half as long and can’t be as long as overhead transmission lines.

        Running a generator for a short period every few years when a line goes down will cost less and cause less pollution than putting in underground lines.

    • Mihies@programming.dev
      link
      fedilink
      English
      arrow-up
      0
      ·
      11 months ago

      36 hrs sounds quite well suited for a i.e. 30kWh battery that you could charge it during night or whenever electricity is cheaper. Depends on your case of course, but it probably could be done like that.